Apparent delay analysis for a flat-plate solar field model designed for control purposes

Gary Ampuño, Lidia Roca, Juan D. Gil, Manuel Berenguel, Julio E. Normey-Rico

Research output: Contribution to journalArticle

Original languageEnglish
Pages (from-to)241-254
Number of pages14
JournalSolar Energy
Volume177
DOIs
StatePublished - 1 Jan 2019

Fingerprint

Dynamic models
Step response
Energy balance
Pipelines
Pipe
Temperature

Keywords

  • Bilinear model
  • Dynamic simulation
  • Solar energy

Cite this

Ampuño, Gary ; Roca, Lidia ; Gil, Juan D. ; Berenguel, Manuel ; Normey-Rico, Julio E. / Apparent delay analysis for a flat-plate solar field model designed for control purposes. In: Solar Energy. 2019 ; Vol. 177. pp. 241-254.
@article{3490d09c64704edda9bada3ebea413b2,
title = "Apparent delay analysis for a flat-plate solar field model designed for control purposes",
keywords = "Bilinear model, Dynamic simulation, Solar energy",
author = "Gary Ampu{\~n}o and Lidia Roca and Gil, {Juan D.} and Manuel Berenguel and Normey-Rico, {Julio E.}",
year = "2019",
month = "1",
day = "1",
doi = "10.1016/j.solener.2018.11.014",
language = "English",
volume = "177",
pages = "241--254",
journal = "Solar Energy",
issn = "0038-092X",

}

Apparent delay analysis for a flat-plate solar field model designed for control purposes. / Ampuño, Gary; Roca, Lidia; Gil, Juan D.; Berenguel, Manuel; Normey-Rico, Julio E.

In: Solar Energy, Vol. 177, 01.01.2019, p. 241-254.

Research output: Contribution to journalArticle

TY - JOUR

T1 - Apparent delay analysis for a flat-plate solar field model designed for control purposes

AU - Ampuño, Gary

AU - Roca, Lidia

AU - Gil, Juan D.

AU - Berenguel, Manuel

AU - Normey-Rico, Julio E.

PY - 2019/1/1

Y1 - 2019/1/1

KW - Bilinear model

KW - Dynamic simulation

KW - Solar energy

UR - http://www.scopus.com/inward/record.url?scp=85056577560&partnerID=8YFLogxK

U2 - 10.1016/j.solener.2018.11.014

DO - 10.1016/j.solener.2018.11.014

M3 - Article

AN - SCOPUS:85056577560

VL - 177

SP - 241

EP - 254

JO - Solar Energy

JF - Solar Energy

SN - 0038-092X

ER -